(no subject)
Spent quite a while trying to figure out why exactly I couldn't understand how to calculate the probability matrix. I remember understanding it in lecture...
And then found out, some 40 minutes later, that a tiny bit of the notes was wrong. THERE IS A DIFFERENCE BETWEEN LARGER AND LARGER-OR-EQUAL-TO, Christian. Please give out correct notes and stop wasting my time.
*grumbles and goes back to revision*
And then found out, some 40 minutes later, that a tiny bit of the notes was wrong. THERE IS A DIFFERENCE BETWEEN LARGER AND LARGER-OR-EQUAL-TO, Christian. Please give out correct notes and stop wasting my time.
*grumbles and goes back to revision*
no subject
because of arbitrage condition
Pmiss/P0 (smaller than equal to) 1+ risk free (larger than equal to) Pmiss/ P0
i am wondering.....is the right termmeant to be instead e.g. Phit/P0
or is he really saying that Pmiss/P0 is equal?????